2027/28 Primary One admission
地利亞(閩僑)英文小學
DSS · Kwai Tsing
- Status
- Partial information
- Application start
- 9 Jun 2026
- Confirmed deadline
- Exact deadline not published
- Tracker updated
- 15 Jul 2026 · HKT
Admission system
Education Bureau Primary One Allocation
Does not participateDSS schools use direct school applications. Education Bureau school net, choice code, Part A, Part B and provisional POA places do not apply.
Official profile 2025
School profile 2025
- Official category
- DSS · Whole day
- District
- Kwai Tsing
- Gender
- Co-educational
- Address
- 新界青衣長安邨第二期屋邨第二小學
- School net
- Not applicable
- Annual fee
- HK$7,370
- Founded
- 2006
- Religion
- 不適用
- Medium
- English
- Site area
- 1443 sq. m
- Classes
- P1: 3 / Total: 18
- Teachers
- Teachers: 38 / Degree: 100% / Postgraduate: 26%
- Secondary pathway
- Not listed
- Contact
- 24325123 · ty@deliagroup.edu.hk
Facilities
- Classrooms
- 24
- Halls
- 1
- Playgrounds
- 2
- Libraries
- 1
Special rooms
舞蹈室、視覺藝術室、音樂室、電腦室、遊戲治療室、STEM學習室、中文學習室及會客室。
Other facilities
花園(Green Paradise)、水耕及魚菜共生系統、積木牆、繪畫牆、電子黑板及中華文化廊。
Special education support
斜道、暢通易達升降機及暢通易達洗手間。
Data provenance
Official profile dataset
Reference year 2025 · Dataset updated 2025-10-31. Schools supply the official profile data; confirm details and later changes with the school.
Unofficial school research
2026 research index: no published Top 100 position
地利亞(閩僑)英文小學 is included in the same calculation pool of 495 eligible official profiles but is outside the published Top 100. P1Tracker does not infer a position of 101 or below or interpret this as family unsuitability.
This is not an Education Bureau ranking, Band 1 list, academic-result table, admission chance or conclusion about an individual child. The index summarizes stated structural fields in official profiles and remains separate from 2027/28 admission status, deadlines and family fit.
Application window
The school has confirmed an opening of 9 Jun 2026, but an exact deadline has not been published.
Date types follow the official wording. Information sessions, interviews, results and document dates are not displayed as application deadlines.
Family planning
Keep this school in your local plan
Verified status and dates stay in this browser. Do not enter application numbers, personal interview times or results.
Source note
Homepage news dated 2026-06-09 says Primary 1 Admission Application for 2027-2028 is now open. Application-procedure page says to apply at the General Office during office hours with HK$30 fee and required documents.
Primary reference
Official school source
Recheck the official school page before applying. The official source takes precedence if it differs from this tracker.
Source-safe answers
Frequently asked questions
When does the 地利亞(閩僑)英文小學 2027/28 P1 application open and close?
The current status is Partial information. The official 2027/28 application opens on 9 Jun 2026, but an exact deadline has not been published. Information sessions, open days, interviews, results, document dates and maintenance windows never replace the application deadline.
Does 地利亞(閩僑)英文小學 participate in Education Bureau Primary One Allocation?
No. P1Tracker classifies 地利亞(閩僑)英文小學 as a DSS school with direct admission for 2027/28. School net, choice code, Part A and Part B do not apply.
Which year do the 地利亞(閩僑)英文小學 fee and school-profile facts refer to?
The school profile and fee field come from the official 2025 Primary School Profiles. The stated annual fee is HK$7,370. It is not an estimated 2027/28 fee; confirm the latest amount with the school.
How does P1Tracker verify the admission information for 地利亞(閩僑)英文小學?
P1Tracker links the 2027/28 status, opening and deadline to the official admission source and labels the official 2025 Primary School Profiles separately. The page was last updated 15 Jul 2026 Hong Kong time; reopen the official page before applying.
How this page is maintained
This page contains official-source facts directly relevant to 2027/28 P1 admission. Partial sources remain marked as partial information, and a date is never treated as a confirmed deadline when its cycle or meaning is unclear.